Product Overview
The XUNDA NP series are unipolar aluminum electrolytic capacitors designed for audio electronic circuits and DC or pulsating circuits with polarity reversal. They offer stable and reliable performance with low loss and are available in a single-ended lead type.
Product Attributes
- Brand: XUNDA
- Origin: Dongguan, China
- Material: Aluminum electrolytic
- Sleeve Color: Black (standard), Purple, Blue, Green, Coffee available
- Certifications: GB2693-88 (Reference Standard)
Technical Specifications
| Series | Customer P/N | Xunda P/N | Capacitance (uF) | Voltage (VDC) | Tolerance (%) | Size (mm) | Leakage Current (uA) | Max Ripple Current (120Hz/105, mA) | Surge Voltage (SV) | Loss (%) | Lead Type |
| NP | NP6851HMC112RB | 6.8 | 50 | 10 | 5*11 | 10.2 | 41 | 63 | 14 | Long Lead | |
| NP | 6.8 | 50 | 10 | 5*11 | 10.2 | 41 | 63 | 14 | Long Lead |
| Series | Rated Voltage (WV) | Capacitance Range | Capacitance Tolerance | Working Temperature Range | Loss Tangent (TAN) @ 120Hz, 25 | Leakage Current (I) | Surge Voltage (SV) |
| NP | 6.3~250V.DC | 1~6800F | 10% | -40~+105 | 0.26 (6.3V) to 0.10 (63V), 0.20 (100V, 160~250V) | I0.03CV or 3A (Max) | Refer to table |
| Rated Voltage (WV) | Surge Voltage (SV) |
| 6.3 | 8 |
| 10 | 13 |
| 16 | 20 |
| 25 | 32 |
| 35 | 44 |
| 50 | 63 |
| 63 | 79 |
| 100 | 125 |
| 160 | 200 |
| 200 | 250 |
| 250 | 300 |
2205131445_Xunda-NP6851HMC112RB_C3003235.pdf
Please Use Our Online Inquiry Contact Form Below If You Have Any Questions, Our Team Will Get Back To You As Soon As Possible