Product Overview
The XUNDA NP series aluminum electrolytic capacitors are low-loss, bipolar capacitors with stable and reliable performance. They are designed for audio electronic circuits and DC or pulsating circuits with polarity reversal. These capacitors are characterized by their single-ended lead wire type and are suitable for direct insertion into mounting.
Product Attributes
- Brand: XUNDA
- Origin: Dongguan, China
- Certifications: GB2693-88 (Reference Standard)
Technical Specifications
| Series | Customer Part No. | XUNDA Part No. | Specification | Processing Form | Capacitance/Voltage | Dimensions (mm) | Tolerance (%) | Leakage Current (uA) | Max Ripple Current (120Hz/105) (mA) | Surge Voltage (SV) |
| NP | NP1051HMC112RB | Long Lead | 1uF/50v | 5*11 | ||||||
| NP | 1uF/50V | Long Lead | 1uF/50V | 5*11 | 10% | 3.0 | 13 | 63 | ||
| NP | 4.7uF/50V | Long Lead | 4.7uF/50V | 6.3*11 | 10% | 3.0 | 13 | 63 | ||
| NP | 10uF/50V | Long Lead | 10uF/50V | 8*12 | 10% | 3.0 | 13 | 63 | ||
| NP | 47uF/50V | Long Lead | 47uF/50V | 10*13 | 10% | 3.0 | 13 | 63 | ||
| NP | 100uF/50V | Long Lead | 100uF/50V | 10*17 | 10% | 3.0 | 13 | 63 | ||
| NP | 220uF/50V | Long Lead | 220uF/50V | 13*20 | 10% | 3.0 | 13 | 63 | ||
| NP | 470uF/50V | Long Lead | 470uF/50V | 16*25 | 10% | 3.0 | 13 | 63 | ||
| NP | 1000uF/50V | Long Lead | 1000uF/50V | 18*25 | 10% | 3.0 | 13 | 63 | ||
| NP | 1uF/63V | Long Lead | 1uF/63V | 5*11 | 10% | 3.0 | 13 | 79 | ||
| NP | 4.7uF/63V | Long Lead | 4.7uF/63V | 6.3*11 | 10% | 3.0 | 13 | 79 | ||
| NP | 10uF/63V | Long Lead | 10uF/63V | 8*12 | 10% | 3.0 | 13 | 79 | ||
| NP | 47uF/63V | Long Lead | 47uF/63V | 10*13 | 10% | 3.0 | 13 | 79 | ||
| NP | 100uF/63V | Long Lead | 100uF/63V | 13*20 | 10% | 3.0 | 13 | 79 | ||
| NP | 220uF/63V | Long Lead | 220uF/63V | 16*25 | 10% | 3.0 | 13 | 79 | ||
| NP | 470uF/63V | Long Lead | 470uF/63V | 18*25 | 10% | 3.0 | 13 | 79 | ||
| NP | 1000uF/63V | Long Lead | 1000uF/63V | 22*25 | 10% | 3.0 | 13 | 79 | ||
| NP | 1uF/100V | Long Lead | 1uF/100V | 6.3*11 | 10% | 3.0 | 13 | 125 | ||
| NP | 4.7uF/100V | Long Lead | 4.7uF/100V | 8*12 | 10% | 3.0 | 13 | 125 | ||
| NP | 10uF/100V | Long Lead | 10uF/100V | 10*13 | 10% | 3.0 | 13 | 125 | ||
| NP | 47uF/100V | Long Lead | 47uF/100V | 13*20 | 10% | 3.0 | 13 | 125 | ||
| NP | 100uF/100V | Long Lead | 100uF/100V | 16*25 | 10% | 3.0 | 13 | 125 | ||
| NP | 220uF/100V | Long Lead | 220uF/100V | 18*25 | 10% | 3.0 | 13 | 125 | ||
| NP | 470uF/100V | Long Lead | 470uF/100V | 22*25 | 10% | 3.0 | 13 | 125 | ||
| NP | 1000uF/100V | Long Lead | 1000uF/100V | 25*30 | 10% | 3.0 | 13 | 125 | ||
| NP | 1uF/160V | Long Lead | 1uF/160V | 8*12 | 10% | 3.0 | 13 | 200 | ||
| NP | 4.7uF/160V | Long Lead | 4.7uF/160V | 10*13 | 10% | 3.0 | 13 | 200 | ||
| NP | 10uF/160V | Long Lead | 10uF/160V | 13*20 | 10% | 3.0 | 13 | 200 | ||
| NP | 47uF/160V | Long Lead | 47uF/160V | 16*25 | 10% | 3.0 | 13 | 200 | ||
| NP | 100uF/160V | Long Lead | 100uF/160V | 18*25 | 10% | 3.0 | 13 | 200 | ||
| NP | 220uF/160V | Long Lead | 220uF/160V | 25*30 | 10% | 3.0 | 13 | 200 | ||
| NP | 1uF/200V | Long Lead | 1uF/200V | 10*13 | 10% | 3.0 | 13 | 250 | ||
| NP | 4.7uF/200V | Long Lead | 4.7uF/200V | 13*20 | 10% | 3.0 | 13 | 250 | ||
| NP | 10uF/200V | Long Lead | 10uF/200V | 16*25 | 10% | 3.0 | 13 | 250 | ||
| NP | 47uF/200V | Long Lead | 47uF/200V | 18*25 | 10% | 3.0 | 13 | 250 | ||
| NP | 100uF/200V | Long Lead | 100uF/200V | 25*30 | 10% | 3.0 | 13 | 250 | ||
| NP | 1uF/250V | Long Lead | 1uF/250V | 13*20 | 10% | 3.0 | 13 | 300 | ||
| NP | 4.7uF/250V | Long Lead | 4.7uF/250V | 16*25 | 10% | 3.0 | 13 | 300 | ||
| NP | 10uF/250V | Long Lead | 10uF/250V | 18*25 | 10% | 3.0 | 13 | 300 | ||
| NP | 47uF/250V | Long Lead | 47uF/250V | 25*30 | 10% | 3.0 | 13 | 300 |
2205131445_Xunda-NP1051HMC112RB_C3003230.pdf
Please Use Our Online Inquiry Contact Form Below If You Have Any Questions, Our Team Will Get Back To You As Soon As Possible