Product Overview
The CD284L series Aluminum Electrolytic Capacitor from Nantong Jianghai Capacitor Co., Ltd. is designed for various electronic applications. This specification sheet details its performance characteristics, dimensions, and material composition, ensuring reliable operation within specified temperature and voltage ranges.
Product Attributes
- Brand: Nantong Jianghai Capacitor Co., Ltd.
- Origin: China
- Product Type: Aluminum Electrolytic Capacitor
- Series: CD284L
- Sleeve Material: PET
- Marking: Laser printing, Ink printing, or Carbon ribbon printing (customer specific options available)
- RoHS Statement: Compliant with RoHS directive standards.
Technical Specifications
| Part No. | Rated Voltage (UR(V)) | Nominal Capacitance (CAP(uF)) | Capacitance Tolerance (%) | Dissipation Factor tg (%) (20, 120Hz) | Leakage Current (LC(uA)) (20, 2 min) | Standard Size D*L(mm) | Ripple Current (mArms) (105, 100k Hz) | Lifetime (Hours) (105) | Lead Form | Sleeve |
| ECR1ELY331MLL080011E | 25 | 330 | 20 | 14 | 82.5 | 8 * 11.5 | 945 | 8000 | Long Lead | PET Black |
2411201900_Nantong-Jianghai-Capacitor-ECR1ELY331MLL080011E_C23066898.pdf
Please Use Our Online Inquiry Contact Form Below If You Have Any Questions, Our Team Will Get Back To You As Soon As Possible