Product Overview
High Voltage Ceramic Capacitor designed for high voltage electric equipment. This capacitor features a ceramic disc construction with solder-coated copper wire terminations. It is suitable for applications requiring high reliability and is manufactured by HVC Capacitor Manufacturing Co.,Ltd.
Product Attributes
- Brand: HVC
- Origin: China (Manufacturing base in Dongguan Humen)
- Material: Ceramic (N4700 military-grade dielectric material for certain models)
- Color: Blue (for ceramic disc type), Black (for bolt type)
- Certifications: Not explicitly mentioned, but N4700 is described as military-grade.
Technical Specifications
| Part Number | Capacitance (pF) | Capacitance Tolerance (%) | DC Rated Voltage (kV) | Temperature Characteristic | Dimensions (mm) (D x T x F) | Lead Spacing (mm) | Lead Style | Packing Type |
| HVC-10KV-DL16-F12.5-102K | 1000 | ±10 | 10 | N4700 | 16 x 4.0 max x 12.5 | 12.5 | Straight long | Bulk |
| HVC N4700 10KV 102K | 1000 | ±10 | 10 | N4700 | 16 x 4.0 max x 12.5 | 12.5 | Straight long | Bulk |
2410121632_HVC-HVC-10KV-DL16-F12-5-102K_C36498925.pdf
Please Use Our Online Inquiry Contact Form Below If You Have Any Questions, Our Team Will Get Back To You As Soon As Possible