Aluminum Electrolytic Capacitor - GF Series
This product approval sheet details the specifications for an aluminum electrolytic capacitor from MILANG ELECTRONICS CO.,LTD. This capacitor is designed for various electronic applications requiring stable capacitance and voltage ratings.
Product Attributes
- Brand: MILANG ELECTRONICS CO.,LTD
- Origin: China
- Product Series: GF
- Color: Green sleeve with white lettering (PET)
- Certifications: RoHS
Technical Specifications
| Customer Part Number | Supplier PN | Series | Capacitance (uF) | Rated Voltage (V) | Size (D x L) | Tolerance | Dissipation Factor (D.F.)/120Hz | Leakage Current (uA) 60s | Impedance () 100KHz | Life (Hrs) 105 | Ripple Current (mA) 100KHz | Surge Voltage | Sleeve | Working Temperature (C) |
| GF 3300UF35V 16X30 | 3300uF35V16x30GF | GF | 3300.0 | 35.0 | 16.0 X 30.0 | -20% ~ +20% | 9.0 | 1155.0 | 0.025 | 2000 | 3100.0 | 44.0 | Green bottom white text PET Long lead | -40 ~ +105 |
Dimensions (Unit: mm)
| D | L | F | d |
| 16.0 0.5 | 30.0 2.0 | 7.5 0.5 | 0.8 0.05 |
Marking
GF 105(M) 35V3300uF RoHS 2502
Storage Conditions
- Storage Temperature: 35
- Storage Humidity: 75% RH
- Capacitor Shelf Life: One year (re-charging required after one year)
2507111630_Econd-3300uF35V16x30GF_C49332885.pdf
Please Use Our Online Inquiry Contact Form Below If You Have Any Questions, Our Team Will Get Back To You As Soon As Possible