<
>
Specifications
Lifetime:
3000hrs@105℃
Operating Temperature:
-40℃~+105℃
Capacitance:
47uF
Height - Seated (Max):
12mm
Pin Spacing:
2.5mm
Voltage Rating:
50V
Diameter:
6.3mm
Equivalent Series Resistance(ESR):
350mΩ
Tolerance:
±20%
Ripple Current:
290mA@100KHz
Mfr. Part #:
GF470M050E120B000
Package:
Through Hole,D6.3xL12mm
Key Attributes
Model Number:
GF470M050E120B000
Product Description
Product Overview
This product is an aluminum electrolytic capacitor from the GF series by MILANG ELECTRONICS CO.,LTD. It is designed for various electronic applications requiring stable capacitance and voltage ratings.
Product Attributes
- Brand: MILANG ELECTRONICS CO.,LTD
- Origin: Hubei, China
- Product Series: GF Series
- Sleeve Material: PET (Green with white lettering)
- Lead Type: Long leads
- Certifications: RoHS
Technical Specifications
| Supplier PN | Customer Part Number | Series | Capacitance (uF) | Rated Voltage (V) | Size (D x L) | Tolerance | DF / 120Hz (%) | Leakage Current (uA) 60s | Impedance 100KHz () | Life (Hrs) | Ripple Current (mA) 100KHz | Surge Voltage (V) | Working Temperature () |
| GF470M050E120B000 | GF 47UF50V 6.3X12 | GF | 47.0 | 50.0 | 6.3 X 12.0 | -20% ~ +20% | 8.0 | 23.5 | 0.35 | 3000 | 290.0 | 63.0 | -40+105 |
2504101957_Econd-GF470M050E120B000_C46526962.pdf
Request A Quote
Please Use Our Online Inquiry Contact Form Below If You Have Any Questions, Our Team Will Get Back To You As Soon As Possible