<
>
Specifications
Lifetime:
3000hrs@105℃
Operating Temperature:
-40℃~+105℃
Capacitance:
470uF
Height - Seated (Max):
17mm
Voltage Rating:
35V
Pin Spacing:
5mm
Diameter:
10mm
Equivalent Series Resistance(ESR):
56mΩ
Ripple Current:
1.21A@100KHz
Tolerance:
±20%
Mfr. Part #:
470UF35VG170GF
Package:
Through Hole,D10xL17mm
Key Attributes
Model Number:
470UF35VG170GF
Product Description
Product Overview
This document specifies the MILANG ELECTRONICS CO.,LTD GF Series Aluminum Electrolytic Capacitor. It is designed for various electronic applications requiring stable capacitance and reliable performance.
Product Attributes
- Brand: MILANG ELECTRONICS CO.,LTD
- Origin: Hubei, China
- Product Series: GF Series
- Color: Green sleeve with white lettering (PET)
- Certifications: RoHS
- Lead Type: Long lead
- Working Temperature: -40 to +105
- Storage Conditions: Temperature 35, Humidity 75% RH, Shelf life: 1 year (recharge required after 1 year)
Technical Specifications
| Part Number | Series | Capacitance (uF) | Rated Voltage (V) | Size (D x L mm) | Tolerance | Dissipation Factor (DF/120Hz) | Leakage Current (uA/60s) | Impedance (/100KHz) | Life (Hrs) | Ripple Current (mA/100KHz) | Surge Voltage (V) | Sleeve | Working Temperature () |
| GF 470UF35VG170GF | GF | 470.0 | 35.0 | 10.0 X 17.0 | -20% ~ +20% | 9.0 | 164.5 | 0.056 | 3000 | 1210.0 | 44.0 | Green PET | -40+105 |
Test Items
| NO | Test Item | Conditions | Specifications |
| 1 | Maximum permissible ripple current | Temperature:1052, Voltage:DC.Voltage+peak ripple voltage Rated voltage, Ripple frequency:100KHz | Refer to table |
| 2 | Surge | Temperature:1052, "ON" position: 30 seconds, "OFF" position: 5 minutes 30 seconds, Duration:1000 cycles | 1.No electrical or mechanical damage. 2.Capacitance change within 15%. 3.D.F.smaller than specification value. 4.Leakage current smaller than specification value. |
| 3 | Temperature Cycle | One Cycle: Rated high category temperature3 303, 25 3MAX; Rated low category temperature3 303, 25 3MAX. Total number of cycles: 5 | 1.No appearance defect. 2.Capacitance change within 5% 3.D.F.smaller than specification value. 4.Leakage current smaller than specification value. |
| 4 | Resistance to Soldering Heat | Warm up time:1202 seconds to reach 1202, Solder bath temperature: 2605, Solder bath composition: Sn-96.5%, Ag-3.0%, Cu-0.5%, Immersion depth: 1.5 to 2.0mm, Immersion duration: 101 seconds | 1.No appearance defect. 2.Capacitance change within 5% 3.D.F.smaller than specification value. 4.Leakage current smaller than specification value. |
| 5 | Solder Ability | Solder bath temperature: 2355, Solder bath composition: Sn-96.5%, Ag-3.0%, Cu-0.5%, Immersion depth: 1.5 to 2.0mm, Immersion duration: 101 seconds | A minimum of 95% the immersed surface is to be coated with the new solder |
| 6 | Low Temperature Characteristics (Max.Impedance Ratio) | working Voltage (v): 6.3, 10, 16, 25, 35, 50, 63, 100 | Impedance Z-40/+20: 8, 6, 4, 3, 3, 3, 3, 3 |
| 7 | High Humidity storage | Temperature:402, Relative humidity:90 to 95%, Duration:2408 hours | 1.No electrical or mechanical damage. 2.Capacitance change within 15%. 3.D.F.smaller than specification value. 4.Leakage current smaller than specification value. |
| 8 | Vent | Conduct under normal lighting for lab work | There shall be no explosion, flash, flame, spark or fire from the capacitor during or after the test, nor shall there be expulsion of any metal from the casing |
| 9 | Terminal strength: Tensile test/winding intensity | Tensile test intensity: Diameter of terminal 0.5d0.8, Tensile Strength(N) 10, continued time 101sec; Diameter of terminal 0.8d1.25, Tensile Strength(N) 20, continued time 101sec. Winding intensity: Diameter of terminal 0.5d0.8, Winding Strength(N) 5, Awl quality 0.51kg; Diameter of terminal 0.8d1.25, Winding Strength(N) 10, Awl quality 1.02kg | 1.No electrical or mechanical damage 2.No appearance damage |
| 10 | Vibration | Frequency range: 10 Hz to 55 Hz, Amplitude: 1.5 mm, Cycle definition: 10Hz to 55 Hz and back to 10Hz, Cycle duration: 1 minute, Duration: 2 hours per direction (3 directions) | 1.No electrical or mechanical damage 2.No appearance damage |
| 11 | Endurance | Capacitors are placed in an oven and applied voltage for 3000 hours at 105. After being restored to 25, capacitors shall meet the specifications. | 1.Capacitance change within 20% of the initial value. 2.D.F.change within 200% of the specified value. 3.Leakage current smaller than specification value. |
| 12 | Shelf Life | Capacitors are placed in an oven for 1000 hours at 105 without applying rated working voltage. After being restored to 25, capacitors shall meet the specifications. | 1.Capacitance change within 20% of the initial value. 2.D.F.change within 200% of the specified value. 3.Leakage current within 200% of the specification value. |
2504101957_Econd-470UF35VG170GF_C46867056.pdf
Request A Quote
Please Use Our Online Inquiry Contact Form Below If You Have Any Questions, Our Team Will Get Back To You As Soon As Possible