Online Service

Online Service

Contact Person
+86 13528435210
quality Capacitor Econd 1000UF10VF120GF2 1000uF 10V Aluminum Electrolytic GF Series Green Sleeve Long Lead factory
<
quality Capacitor Econd 1000UF10VF120GF2 1000uF 10V Aluminum Electrolytic GF Series Green Sleeve Long Lead factory
>
Specifications
Lifetime:
4000hrs@105℃
Operating Temperature:
-40℃~+105℃
Capacitance:
1000uF
Height - Seated (Max):
12mm
Pin Spacing:
2.5mm
Voltage Rating:
10V
Diameter:
8mm
Equivalent Series Resistance(ESR):
80mΩ
Tolerance:
±20%
Ripple Current:
850mA@100KHz
Mfr. Part #:
1000UF10VF120GF2
Package:
Through Hole,D8xL12mm
Key Attributes
Model Number: 1000UF10VF120GF2
Product Description

Product Overview

This product is an aluminum electrolytic capacitor from MILANG ELECTRONICS CO.,LTD, specifically the GF series. It is designed for various electronic applications requiring stable capacitance and voltage ratings.

Product Attributes

  • Brand: MILANG ELECTRONICS CO.,LTD
  • Origin: Hubei, China
  • Product Type: Aluminum Electrolytic Capacitor
  • Series: GF
  • Certifications: RoHS
  • Color: Green sleeve with white lettering
  • Terminal Type: Long lead
  • Processing Method: Taped
  • Working Temperature: -40 to +105

Technical Specifications

Customer Part NumberSupplier PNSeriesCapacitance (uF)Rated Voltage (V)Size (D x L)ToleranceDissipation Factor (D.F.) / 120HzLeakage Current (uA) 60sImpedance () 100KHzLife (Hrs)Ripple Current (mA) 100KHzSurge VoltageSleeveWorking Temperature ()
1000UF10VF120GF2GF1000.010.08.0 X 12.0-20% ~ +20%12.0%100.00.084000850.013.0Green sleeve with white PET lettering, Long lead-40+105

2504101957_Econd-1000UF10VF120GF2_C46867106.pdf

Request A Quote

Please Use Our Online Inquiry Contact Form Below If You Have Any Questions, Our Team Will Get Back To You As Soon As Possible

You Can Upload Up To 5 Files And Each File Sized 10M Max