Product Overview
This product is an aluminum electrolytic capacitor from the GF series, designed for various electronic applications. It offers a capacitance of 22uF with a rated voltage of 50V and a size of 5.0 x 11.0mm. The capacitor features a green sleeve with white PET lettering and long leads, operating within a temperature range of -40 to +105.
Product Attributes
- Brand: MILANG ELECTRONICS CO.,LTD ()
- Origin: China
- Certifications: RoHS
- Color: Green sleeve with white PET lettering
- Lead Type: Long
Technical Specifications
| Part Number | Series | Capacitance (uF) | Rated Voltage (V) | Size (D x L mm) | Tolerance | Dissipation Factor (D.F.) / 120Hz (%) | Leakage Current (LC) uA (60s) | Impedance () @ 100KHz | Life (Hrs) @ 105 | Ripple Current (R.C.) mA @ 100KHz | Surge Voltage (V) | Sleeve | Working Temperature () |
| GF 22UF50V 5X11 | GF | 22.0 | 50.0 | 5.0 X 11.0 | -20% ~ +20% | 8.0 | 11.0 | 1 | 3000 | 180.0 | 63.0 | Green PET | -40 ~ +105 |
2504101957_Econd-22UF50VC110GF_C46867055.pdf
Please Use Our Online Inquiry Contact Form Below If You Have Any Questions, Our Team Will Get Back To You As Soon As Possible